Title Survey Works for the development of 600 lots at Bandar Sungai Chik, Seksyen 3A, Antara Gapi

Client :  Perbadanan Kemajuan Negeri Selangor (PKNS)    

In February 2023, our team was appointed by PKNS (Perbadanan Kemajuan Negeri Selangor) to conduct title survey works for a significant housing development project in Bandar Sungai Chik, Seksyen 3A, Antara Gapi. This project involved subdividing a parcel of land into 600 individual lots, which necessitated a comprehensive approach to surveying and title management to ensure compliance with local regulations and to facilitate the smooth progression of development.

Project Overview

The title survey aimed to accurately define the boundaries of each lot to ensure proper title issuance and to delineate spaces for future construction. This involved meticulous planning to account for local zoning laws, environmental considerations, and access requirements for each lot. By subdividing the land into 600 lots, the project aims to provide residents with a structured living environment while enhancing the overall infrastructure of the area.

Equipment Used

To effectively carry out the title survey works, we employed a range of advanced surveying equipment, including:

  1. Total Station: This essential instrument allowed us to measure angles, distances, and elevations with high precision. The total station's electronic features facilitated efficient data collection and processing.
  2. GPS Survey Equipment: Utilizing high-accuracy GPS units enabled us to ascertain precise geographic positions across the site. This was particularly important for establishing boundary lines and ensuring that the subdivision adhered to legal requirements.
  3. Levels: Optical levels were used to determine height differences across the land. This was critical for understanding the topography of the site and ensuring proper drainage and layout for the housing lots.
  4. Drones: In some instances, drone technology was used for aerial surveying. This provided a comprehensive overview of the site, helping to identify any obstacles or features that needed consideration during the subdivision process.
  5. Cadastral Software: Various surveying software packages were employed for data analysis and planning. These tools enabled us to create accurate maps and plans of the subdivided lots, ensuring that the project met all legal and dimensional requirements.

Conclusion

The collaboration with PKNS in this project highlights our commitment to delivering precise and reliable surveying services. By using state-of-the-art equipment and technology, we aim to facilitate the successful development of this housing project, ultimately contributing to the growth and enhancement of the Antara Gapi area.


Title Survey Works for the development of 600 lots at Bandar Sungai Chik, Seksyen 3A, Antara Gapi
Amirah Fadhilah December 27, 2024
Share this post
Tags
Archive
Underground Utility Mapping Services for Riverbank Reinforcement and Stabilization Projects